1
/
of
8
Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Corduroy Cloud Sofa, 9 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Beige
Vesgantti Large Modular Sectional Sofa, Big Comfy Cloud Couch with Ottoman Deep Seat Corduroy Cloud Sofa, 9 Seater Large Sectional Couches for Living Room, Bedroom and Apartment, Beige
Regular price
$2,879.98 USD
Regular price
Sale price
$2,879.98 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Eight adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
- Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 169"W x 101"D x 35.5"H and seating for 6+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
- Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 6 seater sectional sofa will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
- Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
- Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 5 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Seat Depth : 26 inches
- Weight Limit : 2250 Pounds
- Product Dimensions : 101"D x 169"W x 35.5"H
- Item Weight : 364 Pounds
- Type : Sectional
- Color : Corduroy - Beige
- Special Feature : Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs
- Room Type : Bedroom, Living Room
- Seating Capacity 9.0 : Style Modern
- : Seating Capacity 9.0
- : Style Modern
- Shape Rectangular : Frame Material Wood
- : Shape Rectangular
- : Frame Material Wood
