Skip to product information
1 of 6

Vesgantti 108" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Chenille Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Gray

Vesgantti 108" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Chenille Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Gray

Regular price $2,159.98 USD
Regular price Sale price $2,159.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 56 inches
  • Seat Height : 21 Inches
  • Weight Limit : 1750 Pounds
  • Product Dimensions : 108"D x 108"W x 35.5"H
  • Item Weight : 80 Pounds
  • Type : Sectional
  • Color : Chenille - Gray
  • Special Feature : Cloud Sectional, Extra-deep, Pillow Top Armrest, Removable Cover, Two Sets of Legs
  • Seating Capacity 7 : Style Modern
  • : Seating Capacity 7
  • : Style Modern
  • Shape Rectangular : Frame Material Wood
  • : Shape Rectangular
  • : Frame Material Wood
View full details